A Real Remodel, Every Step
46 episodes documenting a complete down-to-the-studs first-floor remodel and second-story addition — a $790K base contract that grew to over $1 million in total costs. Every phase, every surprise, every dollar.
Pre-Planning
Making the stay-or-move decision, designing the project in 3D, surviving material showrooms, and planning outdoor utilities before the foundation is poured.
Contracts & Finance
Structuring milestone-based payments, protecting your contingency reserve, and understanding the legal protections every homeowner should enforce before signing.
Permitting
Navigating the city plan check, absorbing setback changes that reshape your interior layout, and using a fee waiver covenant to save over $31,000 in linkage fees.
Pre-Demo
Mandatory environmental testing for asbestos and lead, licensed abatement with negative-air containment zones, and identifying salvageable fixtures before demolition.
Mobilization & Demolition
Setting the perimeter fence, managing neighbor relationships, capping utilities at the street, and the controlled reality of structural demolition day.
Foundation
Grading and excavating deep structural trenches, clearing buried roots, conducting soil compaction density tests, and passing the concrete foundation inspection.
Framing & Rough Systems
Raising the structural wood shell, routing HVAC ducts, roughing electrical and plumbing, installing fire sprinklers, sealing the roof deck, and framing window openings.
Rough Inspections
The mandatory city sign-off on structural framing, electrical, plumbing, and mechanical — the project pause no wall can legally be closed without.
Insulation & Drywall
Soundproofing with Rockwool and MLV, a city-mandated spray foam upgrade, closing the walls with Level 5 drywall, chasing a rooftop HVAC leak, and leveling subfloors.
Exterior
Applying smooth three-coat stucco with anti-crack membrane and testing colors on site — then detailing composite wood siding at every miter, corner, and seam.
Finishes
Cabinets, tile, countertops, paint sheens, frameless glass railings, hardware, a bathtub crisis, utility commissioning, and getting appliances installed flush on delivery day.
Closeout
The blue tape punch list walkthrough, managing post-construction realities after move-in, and securing lien releases for the official project handover.