Outdoor Utility Planning
This is the highest-leverage window in any renovation: the period when trenches are open, conduit is cheap, and adding a utility run costs a few hundred dollars. After the concrete is poured, the same run costs thousands. Work through this checklist before your foundation forms are set.
Running conduit before the pour: ~$200–$500. Coring through finished concrete and patching: $2,000–$8,000+. Missing this window is one of the most expensive mistakes in outdoor renovation.